Hace unas semanas comenzamos las obras de construcción de una Vivienda Unifamiliar Aislada en La Manga del Mar Menor.
Os mostramos un breve resumen de los trabajos realizados para la ejecución de la losa de cimentación y del forjado sanitario (sistema Cáviti), así como de los pilares de planta baja.
A few weeks ago we started the construction works of a detached single-family house in La Manga del Mar Menor.
Here we show you a brief summary of the works maded for the implementation of the foundation slab and the insulating suspended flooring (system Cáviti), as well as for the pillars of ground floor.
A few weeks ago we started the construction works of a detached single-family house in La Manga del Mar Menor.
Here we show you a brief summary of the works maded for the implementation of the foundation slab and the insulating suspended flooring (system Cáviti), as well as for the pillars of ground floor.
Replanteo de la losa de cimentación
Vertido de 10 cm de hormigón de limpieza
Montaje de las armaduras de la losa de cimentación
Revisando las armaduras/recubrimientos de de la losa de cimentación
Hormigonado de la losa de cimentación
Hormigonado de la losa de cimentación
Encofrado de los pilares de planta baja
Montaje de los pilares metálicos
Instalación de los tubos de saneamiento bajo el forjado sanitario tipo Cáviti
Instalación de los tubos de saneamiento bajo el forjado sanitario tipo Cáviti
Montaje del forjado sanitario tipo Cáviti
Montaje del forjado sanitario tipo Cáviti